Installation and Assembly
Before buying an Action Climbing Frame it is important to measure your garden. To ensure safety an unobstructed area of 1.5m should be left clear around your climbing frame as well as 2.5m clear zone in front and behind swings.
Although it is possible for climbing frames to be assembled by one person it is not recommended. Action climbing frames are large and heavy due to the substantial timber we use; therefore, we advise that assembly is undertaken by two or more people. | ![]() |
When assembling your Action climbing Frame you will need the following tools:
- 13mm box or socket spanner
- 17mm box or socket spanner
- A cordless drill with Philips screwdriver
- Spirit Level
- Tape measure
Build times are set out in the table below, but are a guideline only and assume a reasonable level and clear area.
| Arundel | Arundel Twin | Monmouth | Monmouth Twin | York | Carisbrooke | Gate Lodge | Monkey Bars | |
| Approx Build Time | 6-8 Hours | 8-10 Hours | 6-8 Hours | 6-10 Hours | 6-8 Hours | 6-10 Hours | 10-12 Hours | 4-6 Hours |
When assembling your climbing frame, you may find it easier to make up the
tower components horizontally before raising them upright. The majority of
our climbing frames allow you to arrange your climbing frame in multiple
configurations to fit the shape of your garden. Therefore, we advise using our
'Action 3D' software as it will give you accurate dimension of your climbing
frame layout.






